PLANNING &
SITE DESIGN
Integrated planning and site design solutions that support reliable infrastructure and responsible development.
Planning & Site Design Solutions for
Smart Development
Carroll Engineering provides civil engineering plans and planning and site development services in Pennsylvania and New Jersey. From initial site investigations, feasibility studies, and conceptual design through final record documents and the construction phase, our engineering team is here to help.
These civil engineering services include physical site analyses, ordinance reviews, preparation of land development plans and documents, landscape design, stormwater management, grading and erosion control, utility design, permit applications, and construction support. Projects include municipal, residential, commercial, educational, industrial, and institutional subdivision site development projects and land development projects.
Planning & Site Design Services
- Feasibility Studies/Yield Analysis
- Conceptual Design
- Grading Design
- Erosion and Sediment Control Designs
- Utility Layout
- Landscape Design
- Outdoor Lighting Design (Ex: Sports Lighting)
- Innovative Stormwater Management and Infiltration Systems
- Active Recreation (Ex: Playing Fields, Running Tracks, & Stadiums)
- Parks and Trail Designs
- Streetscape Design
- Construction Specifications
Featured Planning & Site Design Projects
Phoenixville Luxor Luxury Apartment Complex
Borough of Phoenixville, Chester County, PA
CEC worked closely with Upper Mount Bethel Township to obtain the grant assistance needed to complete the Township Community Park, as well as providing the engineering and construction observation of the pavilion and basketball court section of the project.
Vereinigung Erzgebirge Turf Club Development
Warminster Township, Bucks County, PA
Carroll Engineering provided civil engineering, surveying, and site design services to transform existing grass fields into high-performance synthetic turf soccer fields. The project included site grading, drainage improvements, and stormwater management facilities designed to meet NPDES permitting requirements. The completed improvements enhance field usability, increase playing capacity, and provide durable recreational fields for the club and surrounding community.